" /> Is Phase Cumulative Plan Question - CISMeF





Preferred Label : Is Phase Cumulative Plan Question;

NCIt related terms : Is Phase Cumulative Plan;

NCIt definition : A question about whether the plan or plan sum represents all plans treated in a single phase. All plans in a phase treated the same targets to the same dose per fraction, using the same modality and technique. Multiple plans for a single phase occur with plan revisions (e.g. re-drawing target volumes ) or with the use of technologies enabling per session adaptation. If more than one plan is used in the phase, then this would correspond to a plan sum.;

Alternative definition : OORO: The plan or plan sum (ATPS) represents all plans treated in a single phase. All plans in a phase treated the same targets to the same dose per fraction, using the same modality and technique. Multiple plans for a single phase occur with plan revisions (e.g. redrawing target volumes ) or with use of technologies enabling per session adaptation. If more than one plan is used in the phase, then this would correspond to a plan sum.;

NCI Metathesaurus CUI : CL1912445;

Détails


Vous pouvez consulter :


Nous contacter.
31/07/2025


[Accueil] [Haut de page]

© CHU de Rouen. Toute utilisation partielle ou totale de ce document doit mentionner la source.