Preferred Label : Project Conduct Date Range;
NCIt related terms : ProjectConduct.dateRange;
Alternative definition : BRIDG 5.3: Specifies the period of time over which the project was executed. EXAMPLE(S):
OTHER NAME(S): NOTE(S): May specify the start and/or end or duration. For the StudyConduct
subclass, this attribute can be derived from the StudyOverallStatus.date values where
StudyOverallStatus.code Study Activated and Study Completed.;
NCI Metathesaurus CUI : CL978204;
Origin ID : C165053;
UMLS CUI : C5236845;
Semantic type(s)
concept_is_in_subset