Preferred Label : Observation Result Action Taken Relationship;
NCIt related terms : ObservationResultActionTakenRelationship;
NCIt definition : Specifies the link between an observation result and the actions taken as a result
of that outcome.;
Alternative definition : BRIDG 5.3: Specifies the link between an observation result and the actions taken
as a result of that outcome. EXAMPLE(S): An electrical problem (product investigation
result) in a device could result in a recall (product action taken) of the device.
An abnormal lab result triggers a follow-up lab test for further investingation. Study
dose reduced or protocol treatment change due to an adverse event. OTHER NAME(S):
AdverseEventActionTakenRelationship, ProductActionTakenRelationship NOTE(S): Action
taken relationship is generally used for unplanned activities rather than those already
determined in contingent relationships in the planned study design.;
NCI Metathesaurus CUI : CL977563;
Origin ID : C164399;
UMLS CUI : C5236219;
- Automatic exact mappings (from CISMeF team)
- Semantic type(s)
- concept_is_in_subset